GREETINGS CEMerzz~~
email from Dr. Saiful....
Askm & Good Afternoon HND CE & CEM 25,
Below are compressive strength results for your cylinder specimens tested at exactly 28 days age. You should utilize these results to further backup your report.
Group (During Practical)
Specimen Identification
Specimen Age
Mass (g)
Force (kN)
A1
A2/4
28 days
3679
150.2
A2
A4/3
28 days
3122
50.3
B1
B2/3
28 days
3645
172.6
B2
B4/4
28 days
3006
53.9
C1
C2/3
28 days
3650
121.8
C2
C3/3
28 days
3585
173.5
CEM1
M2/4
28 days
3672
268.8
CEM2
M4/4
28 days
3679
253.3
Talking to some of you, I gather that most are already clear with the updates on the grouping schemes, so I won’t repeat what has already been stated below.
Since 2 groups will therefore be assessing the same set of data, I will add 5% to the group which produces the better report between the 2 to ensure you work independently within your group. (In total there are 16 reports with 8 sets of data).
Wassalam & Regards
Pg Dr Saiful
P.S.. I THINK ITS NOT VERY CLEAR ( RESULT TEST), PLEASE DO CHECK OUR EMAIL FOR MORE DETAIL.
Concrete practical test result
hello Friends~~
here is Dr. Ina's Email.. saying...
"Dear All,
Please find attached the handouts for our next lecture. The tutorial sheet for this topic will be sent to you later.
Thank you,
Dr. Ena
~ Nisa
Fresh Concrete practical reports
Common mistakes:
· Batching errors for Group B (and possibly Group C): if you have spotted that the actual quantities of ingredients were wrong, you should have pointed this out as these would have affected workability (and other properties) of the concrete.
· For the compacting factor, the masses of partially-compacted concrete and fully-compacted concrete must exclude the mass of the empty cylinder.
· Copying procedures straight from the handout. Thus, many left out how slump was measured using a ruler and tamping rod.
· Similarly, which specimens were hand-compacted and which were vibrated or uncompacted were not clearly stated in most reports.
· Some of you did not include the apparatus & procedures for batching, mixing, casting, compacting and curing, focusing only on the workability tests (slump and compacting factor).
· Many left out answering question no. 4. If the workability was higher, then the slump and compacting factor values would have been larger, and the concrete for your specimens would have been easier to scoop, pour, cast, compact and finish. And vice-versa for lower workability concrete.
· No references were given by many of you, although it is clear that some material (e.g. table of different workabilities) were copied from other sources. This constitutes plagiarism, and should have received a fail grade (if not worse). Be careful with this for future reports.
· There is no need to mention irrelevant material like Vebe tests, asphaltic concrete, what hydraulic cement is, etc. Your report should focus on what was done in the practical itself i.e. batching, mixing, workability tests, casting, compaction, curing.
· I have noticed some groups copying from previous years’ reports – and thus making a lot of mistakes.
· “Equipment” is always singular, never plural (“equipments”).
· “Coarse” aggregates, not “course” aggregates. Don’t rely on spell-check too much.
· It appears very few of you, if any, referred to the relevant British Standards listed in your handout. This would have helped significantly.
Mr Yap
GRETTINGS CEM25~~
email from Mr. Yap~~~ :D
In addition, please note that you will be required to return to the Concrete Lab the next (working) day after the practical to demould the specimens which you have made. This will should take about 15-20 minutes.
The schedule is as follows (all this week):
Group
Practical
Demoulding
CE B
Tues 1.35-3.30 pm
Wed 11.20 am (after Surveying)
CE C
Wed 8.00-9.55 am
Thur 11.20 am (after Surveying)
CE A
Thur 8.00-9.55 am
Sat 10.20 am (after Drawing)
CEM
Thur 1.35-3.30 pm
Sat 11.20 am (after Surveying)
Mr Yap
2009/9/26 YYH CE ITB <yyhceitb@gmail.com>
Selamat Hari Raya to all muslim students.
Please find attached the handout for the fresh concrete laboratory practical to be held this coming week. You will need to print it out and read through it thoroughly in preparation for the practical. If you do not read and understand the procedures, it is likely that you will make mistakes and cause unnecessary delays during the practical.
Don't forget to wear your overalls and safety boots for this practical.
FROM MR. YAP
~ Nisa
survey ohh survey
Assalamualaikum.w.w. and Good Afternoon.
As some of you had asked me regarding the test on my part, I will include everything that I had taught you from the theory to the calculation (including the use of the calculation table).
What I WILL NOT include in this test or the exam is the title “Adjustments using Bearing Misclosure” which are in your notes.
Attempting the tutorial that I had given you will give you enough practice for the bearing calculation.
Test details are as follows:
It will be 1hr 30mins.
Miss Roze
Section A:
Two Questions. Answer all
Section B:
Four Questions. Answer only three.
Mr Muizz
Two Questions. Answer all.
Slides on Basic Differentiation [maths]..
Assalammualaikum CEM25-ers..
Slides on Basic Differentiation [maths]is available to download, make sure whoever wants the copy INFORM to Nisa ayt and siapa yg na mau atu pun gtau jua ayt..supaya tiada confuse2 hehehe
*btw..9th Sept dh sir antar slide aa...duii maaa~~ari rabu lepas sih hehehe*
Wane :)
Information based on Report Due date & Test
Assalamualaikum.w.w. and Good Afternoon intake 25 CEM students.
Regarding your survey test dates and times:
Group CEM
will be having your survey test on Wednesday, 16/09/2009 on periods 1 - 2 at room GF.30
********************************************
Dear students CEM,
Just to inform you that on Wednesday, 16/09/2009, there will NOT be a class in the afternoon, period 7 (alternate week slot for surveying).
********************************************
Assalamualaikum.w.w. and Good Afternoon
With reference to the above subject, I have decided to give you an extension on your report submission deadline.
The new deadline for the report will be on:
Date: Monday, 28th September 2009
Time: 09:00 am
Location: my office, 2F.103
Best Regards,
Muizz
Ps- good luck in your forthcoming class test and angular measurement report.
*Wane
Angular Measurement Exercise & CTT..
Assalamualaikum.w.w.
Lecture week 7
Attached are the tutorial questions for Angular Measurement.
Please attempt the questions in the tutorial to prepare yourself for your class test.
Class Test (CTT)
Tentative dates are as follows:
Group C CEM – Weds, 16th Sept 2009. Period 7 (1400 – 1450)
The time, date and contents of the phase test will be confirmed in due time.
Regards,
Mr Muizz
Lecturer
(Surveying One – Semester One)
*check the email ayt~~~ :) and apa2..u noe what to do heheheh
Roll Number [after modifying]..
- AL
- HANIF
- --------------------------
- JUDE
- NAZ
- CAROL
- ZEERAH
- ELLA
- SYAZ
- FIZAH
- QAM
- NINA
- ISMAH
- SHA
- IZYAN
- AIMI
- NISA
- WARDAH
- ADEK
- NIEA
- YUS
- HASRIN -CEM24/006/08
- KHAI - CEM24/018/08
- WANE - CEM24/024/08
FYI : ngalih ku kn un-caps lock hahahahhhaa
Wane
CEM-ers 25 Messages
CEM-ers 25 Contacts
nisa-604-nesa@hotmail.com
Nazmo
nazmom3thodm4n@hotmail.com
Zirah
gyrah1812@hotmail.com
Ella
suhailah_rush73@hotmail.com
Ismah
norees18@hotmail.com